{"schema_version":"verify.report.v1","generated_at":"2026-10-07T04:28:43.459050+00:00","snapshot_id":"trustsnap_d05b9d3f70c58dc0","server":{"namespace":"HorizunGroup","name":"horizun-msproject-mcp","title":"Horizun Project MCP","description":"An MCP server for Microsoft Project that reads, analyzes, and writes .mpp, .xer, and .xml schedule files, offering critical path analysis, DCMA 14-point assessment, and verified writes without requiring Java or Microsoft Project.","homepage_url":"https://glama.ai/mcp/servers/z7a7vvhs40","docs_url":null,"icon_url":null,"support_url":"https://github.com/HorizunGroup/horizun-msproject-mcp","remote_url":"https://glama.ai/mcp/servers/z7a7vvhs40","server_card_url":null,"latest_version":null,"current_status":"unknown","current_score":null,"transport_type":"streamable-http","has_oauth":false,"has_dcr":false,"has_prompts":false,"tool_count":0,"current_validation_schema_version":"8058defc70ca932c","last_validated_at":"2026-10-06T20:19:57.882467+00:00","registry_source":"glama_registry","registry_identifier":"glama_registry:z7a7vvhs40","canonical_identifier":null,"current_score_components":{"auth_operability_score":0.0,"error_contract_score":0.0,"rate_limit_semantics_score":2.0,"schema_completeness_score":0.0,"backward_compatibility_score":4.0,"slo_health_score":0.0,"security_hygiene_score":0.0,"task_success_score":0.0,"trust_confidence_score":1.0,"prompt_contract_score":2.0,"resource_contract_score":2.0,"discovery_metadata_score":1.0,"registry_consistency_score":2.0,"installability_score":0.0,"session_semantics_score":0.0,"tool_surface_design_score":0.0,"result_shape_stability_score":0.0,"oauth_interop_score":0.0,"recovery_semantics_score":0.0,"maintenance_signal_score":2.0,"adoption_signal_score":1.0,"freshness_confidence_score":1.0,"transport_fidelity_score":0.0,"spec_recency_score":0.0,"session_resume_score":0.0,"step_up_auth_score":1.0,"utility_coverage_score":0.0,"advanced_capability_coverage_score":0.0,"connector_publishability_score":0.0,"tool_snapshot_churn_score":0.0,"connector_replay_score":1.0,"request_association_score":1.0,"interactive_flow_safety_score":0.0,"official_registry_presence_score":2.0,"safety_transparency_score":2.0,"tool_capability_clarity_score":0.0,"data_exfiltration_resilience_score":0.0,"dependency_supply_chain_signal_score":0.0,"input_sanitization_safety_score":0.0,"tool_namespace_clarity_score":0.0},"capability_taxonomy":[],"machine_summary":{},"taxonomy_tags":[],"score_decomposition":[],"validation_diff":null,"tool_snapshot_diff":null,"connector_replay":{},"request_association":{},"production_readiness":{"code":"metadata_only","label":"Metadata only","reason":"No live validation evidence exists yet for this entry.","badge":"score-low"},"recommended_for":[],"history_summary":{},"validation_timeline":[],"evidence_confidence":{"score":null,"label":"not_assessed","reason":"No evidence-bearing validation runs exist yet (0 captured checks, validation age 8.1 hours). Confidence cannot be computed.","live_check_count":0,"validation_age_hours":8.15,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":8.15,"freshness_threshold_hours":24}},"incident_feed":[],"disputes":[],"remediations":[],"client_remediation_modes":[],"client_profiles":[],"client_readiness_verdicts":[],"publishability_policy_profiles":[],"compatibility_fixtures":[],"install_snippets":{},"aliases":[],"raw_evidence":{"checks":{"probe_noise_resilience":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"server_card":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"oauth_protected_resource":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"oauth_authorization_server":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"openid_configuration":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"initialize":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"protocol_version_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"tools_list":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"instruction_tool_reference_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"prompts_list":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"prompt_get":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"resources_list":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"resource_read":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"determinism_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"session_resume_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"step_up_auth_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"transport_compliance_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"utility_coverage_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"advanced_capabilities_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"tool_snapshot_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"connector_replay_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"request_association_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"interactive_flow_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"action_safety_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"official_registry_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"provenance_divergence_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"schema_divergence_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}},"connector_publishability_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"registry_listing_url"}}}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA","message":"No endpoint is on record for this entry, so its 8.1h-old last_validated_at stamp is a no-op run, not real validation evidence -- treated as outside the TrustOps SLA regardless of age.","addressee":"publisher"},{"code":"registry_endpoint_invalid","severity":"medium","title":"Registry endpoint does not serve MCP","message":"The glama_registry entry's remote_url is a directory listing, not a live MCP endpoint.","addressee":"registry"}],"maintainer_analytics":{},"public_server_reputation":{},"maintainer_response_quality":{},"maintainer_annotations":[],"maintainer_rebuttals":[],"security_posture_summary":{},"tool_security_inventory":[],"transport_compliance":{},"utility_coverage":{},"write_action_governance":{},"provenance_divergence":{},"alias_consolidation":{},"alert_routing":{},"authenticated_validation":{},"hosted_runtime":{},"action_controls_diff":null,"benchmark_tasks":[],"latest_capability_counts":{},"point_loss_breakdown":[],"verdict_traces":{},"current_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_d05b9d3f70c58dc0","generated_at":"2026-10-07T04:28:43.471554+00:00","trust_evaluated_at":"2026-10-07T04:28:43.471554+00:00","evidence_revision":"b631b674a2cdc45c2a0ccdd0","source":"current_snapshot","server":"HorizunGroup/horizun-msproject-mcp","last_validated_at":"2026-10-06T20:19:57.882467+00:00","validation_age_hours":8.15,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-10-06T20:19:57.882467+00:00","age_hours":8.15,"bucket":"verified_last_24h","label":"Verified in last 24h","badges":["verified_last_24h"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"unknown","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Block for production","why":"no blocking gaps found in current evidence","next_action":"revalidate, add safeguards, export policy","reason_count":1},"production_readiness_class":{"code":"metadata_only","label":"Metadata only","reason":"No live validation evidence exists yet for this entry."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":8.15,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":8.15,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"registry_endpoint_invalid","severity":"medium","title":"Registry endpoint does not serve MCP"}],"active_alert_summary":{"critical":0,"high":0,"medium":2,"low":0,"high_or_critical":0,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-10-07T04:28:43.471554+00:00"}},"trust_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_d05b9d3f70c58dc0","generated_at":"2026-10-07T04:28:43.471554+00:00","trust_evaluated_at":"2026-10-07T04:28:43.471554+00:00","evidence_revision":"b631b674a2cdc45c2a0ccdd0","source":"current_snapshot","server":"HorizunGroup/horizun-msproject-mcp","last_validated_at":"2026-10-06T20:19:57.882467+00:00","validation_age_hours":8.15,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-10-06T20:19:57.882467+00:00","age_hours":8.15,"bucket":"verified_last_24h","label":"Verified in last 24h","badges":["verified_last_24h"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"unknown","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Block for production","why":"no blocking gaps found in current evidence","next_action":"revalidate, add safeguards, export policy","reason_count":1},"production_readiness_class":{"code":"metadata_only","label":"Metadata only","reason":"No live validation evidence exists yet for this entry."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":8.15,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":8.15,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"registry_endpoint_invalid","severity":"medium","title":"Registry endpoint does not serve MCP"}],"active_alert_summary":{"critical":0,"high":0,"medium":2,"low":0,"high_or_critical":0,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-10-07T04:28:43.471554+00:00"}},"agent_commerce":{},"latest_claim":null,"maintainer_profile_slug":null,"watch_summary":{},"partial":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"trust_evaluated_at":"2026-10-07T04:28:43.471554+00:00","evidence_revision":"b631b674a2cdc45c2a0ccdd0","active_alert_summary":{"critical":0,"high":0,"medium":2,"low":0,"high_or_critical":0,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-10-07T04:28:43.471554+00:00"},"owner_opted_out":false},"latest_validation":null,"current_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_d05b9d3f70c58dc0","generated_at":"2026-10-07T04:28:43.471554+00:00","trust_evaluated_at":"2026-10-07T04:28:43.471554+00:00","evidence_revision":"b631b674a2cdc45c2a0ccdd0","source":"current_snapshot","server":"HorizunGroup/horizun-msproject-mcp","last_validated_at":"2026-10-06T20:19:57.882467+00:00","validation_age_hours":8.15,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-10-06T20:19:57.882467+00:00","age_hours":8.15,"bucket":"verified_last_24h","label":"Verified in last 24h","badges":["verified_last_24h"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"unknown","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Block for production","why":"no blocking gaps found in current evidence","next_action":"revalidate, add safeguards, export policy","reason_count":1},"production_readiness_class":{"code":"metadata_only","label":"Metadata only","reason":"No live validation evidence exists yet for this entry."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":8.15,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":8.15,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"registry_endpoint_invalid","severity":"medium","title":"Registry endpoint does not serve MCP"}],"active_alert_summary":{"critical":0,"high":0,"medium":2,"low":0,"high_or_critical":0,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-10-07T04:28:43.471554+00:00"}},"trust_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_d05b9d3f70c58dc0","generated_at":"2026-10-07T04:28:43.471554+00:00","trust_evaluated_at":"2026-10-07T04:28:43.471554+00:00","evidence_revision":"b631b674a2cdc45c2a0ccdd0","source":"current_snapshot","server":"HorizunGroup/horizun-msproject-mcp","last_validated_at":"2026-10-06T20:19:57.882467+00:00","validation_age_hours":8.15,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-10-06T20:19:57.882467+00:00","age_hours":8.15,"bucket":"verified_last_24h","label":"Verified in last 24h","badges":["verified_last_24h"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"unknown","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Block for production","why":"no blocking gaps found in current evidence","next_action":"revalidate, add safeguards, export policy","reason_count":1},"production_readiness_class":{"code":"metadata_only","label":"Metadata only","reason":"No live validation evidence exists yet for this entry."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":8.15,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":8.15,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"registry_endpoint_invalid","severity":"medium","title":"Registry endpoint does not serve MCP"}],"active_alert_summary":{"critical":0,"high":0,"medium":2,"low":0,"high_or_critical":0,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-10-07T04:28:43.471554+00:00"}},"partial":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"snapshot_invariant":{"schema_version":"verify.snapshot_invariant.v1","server":"HorizunGroup/horizun-msproject-mcp","ok":true,"surface_snapshot_ids":{"page":"trustsnap_d05b9d3f70c58dc0","badge":null,"report":"trustsnap_d05b9d3f70c58dc0","policy":null},"checked_surfaces":["page","report"],"unchecked_surfaces":["badge","policy"],"checked_count_surfaces":[],"count_mismatches":{},"checked_at":"2026-10-07T04:28:43.459225+00:00"},"history":{},"production_readiness":{"code":"metadata_only","label":"Metadata only","reason":"No live validation evidence exists yet for this entry.","badge":"score-low"},"agent_commerce_readiness":{},"evidence_confidence":{"score":null,"label":"not_assessed","reason":"No evidence-bearing validation runs exist yet (0 captured checks, validation age 8.1 hours). Confidence cannot be computed.","live_check_count":0,"validation_age_hours":8.15,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":8.15,"freshness_threshold_hours":24}},"recommended_for":[],"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA","message":"No endpoint is on record for this entry, so its 8.1h-old last_validated_at stamp is a no-op run, not real validation evidence -- treated as outside the TrustOps SLA regardless of age.","addressee":"publisher"},{"code":"registry_endpoint_invalid","severity":"medium","title":"Registry endpoint does not serve MCP","message":"The glama_registry entry's remote_url is a directory listing, not a live MCP endpoint.","addressee":"registry"}],"remediations":[],"cache_note":"Fast fallback response; full report evidence is deferred to protect web capacity. Fields listed in fields_unavailable (including tool_security_inventory, and write_action_governance) are not yet computed on this response -- an empty value means unchecked, not confirmed clean. Treat partial responses as indeterminate.","publisher_claim":{"verified":false,"status":"unclaimed","claim_url":"https://verify.sentinelsignal.io/claim?server=HorizunGroup%2Fhorizun-msproject-mcp&source=report_json","reason_code":"claim_to_publish_metadata","reason":"Claim this profile to verify publisher identity, add evidence, and manage trust metadata.","score_neutral":true},"observed_attention":{"schema":"verify.observed_attention.v1","window_days":30,"level":"none","label":"No observed attention","summary":"No recent machine-readable trust or discovery activity observed for this server.","segments":{"useful_ai_user":{"level":"none","observed":false,"description":"AI-assisted user sessions such as ChatGPT/User or Claude/User."},"machine_trust_evaluator":{"level":"none","observed":false,"description":"Synthetic sessions inspecting multiple trust surfaces such as report, policy, ledger, badge, trust-summary, or compare."},"possible_agent_or_script":{"level":"none","observed":false,"description":"Structured direct sessions with rapid profile, compare, report, policy, badge, or trust-surface fan-out."},"isolated_machine_surface":{"level":"none","observed":false,"description":"Aged-out direct synthetic singleton sessions that touched a machine-readable trust surface without becoming a broader evaluator."},"ai_crawler":{"level":"none","observed":false,"description":"Known AI crawler activity such as ClaudeBot, GPTBot, or similar crawlers."},"search_crawler":{"level":"none","observed":false,"description":"Search and SEO crawler activity."},"browser_like_automation":{"level":"none","observed":false,"description":"Browser-like synthetic sessions with rapid structured endpoint activity."},"confirmed_human":{"level":"none","observed":false,"description":"Confirmed browser-session human activity."}},"surfaces_observed":{"server_profile":false,"compare":false,"compare_json":false,"compare_api":false,"report_json":false,"policy":false,"ledger":false,"badge_metadata":false,"badge_svg":false,"trust_summary":false,"mcp_tool":false},"claim_prompt":{"recommended":false,"reason":"No claim prompt is recommended from observed attention in the current window."},"notes":["Observed attention is based on segmented first-party telemetry.","Crawler and evaluator activity is not treated as confirmed human demand.","Public levels are bucketed to avoid exposing raw traffic counts."]},"owner_activation":{"claim_recommended":false,"reason":"no_observed_attention"},"related_machine_surfaces":{"compare_index":"/compare.json","compare_api":"/v1/compare?server=HorizunGroup%2Fhorizun-msproject-mcp","trust_summary":"/v1/servers/HorizunGroup/horizun-msproject-mcp/trust-summary","ledger":"/v1/servers/HorizunGroup/horizun-msproject-mcp/ledger","policy":"/v1/servers/HorizunGroup/horizun-msproject-mcp/policy","report":"/v1/servers/HorizunGroup/horizun-msproject-mcp/report"},"intelligence_api":{"available":true,"signup_url":"https://verify.sentinelsignal.io/verify-intelligence-api","use_case":"Programmatic MCP server trust, comparison, policy, and evidence enrichment."},"trust_evaluated_at":"2026-10-07T04:28:43.471554+00:00","evidence_revision":"b631b674a2cdc45c2a0ccdd0","active_alert_summary":{"critical":0,"high":0,"medium":2,"low":0,"high_or_critical":0,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-10-07T04:28:43.471554+00:00"}}