{"schema_version":"verify.report.v1","generated_at":"2026-08-14T19:53:39.960964+00:00","snapshot_id":"trustsnap_8069bc5966a46e18","server":{"namespace":"github-horizungroup","name":"horizun-msproject-mcp","title":"HorizunGroup/horizun-msproject-mcp","description":"MCP server for Microsoft Project: no Java, no Project install. Critical-path engine, DCMA 14-point assessment, verified writes, and a BIM 4D bridge.","homepage_url":"https://github.com/HorizunGroup/horizun-msproject-mcp","docs_url":"https://github.com/HorizunGroup/horizun-msproject-mcp","icon_url":"https://avatars.githubusercontent.com/u/312141329?v=4","support_url":"https://github.com/HorizunGroup/horizun-msproject-mcp","remote_url":null,"server_card_url":null,"latest_version":null,"current_status":"failing","current_score":null,"transport_type":null,"has_oauth":false,"has_dcr":false,"has_prompts":false,"tool_count":0,"current_validation_schema_version":"8058defc70ca932c","last_validated_at":"2026-08-14T13:27:39.412670+00:00","registry_source":"github_topic_registry","registry_identifier":"github_topic_registry:HorizunGroup/horizun-msproject-mcp","canonical_identifier":null,"current_score_components":{"auth_operability_score":0.0,"error_contract_score":0.0,"rate_limit_semantics_score":2.0,"schema_completeness_score":0.0,"backward_compatibility_score":4.0,"slo_health_score":0.0,"security_hygiene_score":0.0,"task_success_score":0.0,"trust_confidence_score":1.0,"prompt_contract_score":0.0,"resource_contract_score":0.0,"discovery_metadata_score":1.0,"registry_consistency_score":3.0,"installability_score":0.0,"session_semantics_score":0.0,"tool_surface_design_score":0.0,"result_shape_stability_score":0.0,"oauth_interop_score":0.0,"recovery_semantics_score":0.0,"maintenance_signal_score":2.0,"adoption_signal_score":1.0,"freshness_confidence_score":1.0,"transport_fidelity_score":0.0,"spec_recency_score":0.0,"session_resume_score":0.0,"step_up_auth_score":0.0,"transport_compliance_score":0.0,"utility_coverage_score":0.0,"advanced_capability_coverage_score":0.0,"connector_publishability_score":0.0,"tool_snapshot_churn_score":0.0,"connector_replay_score":0.0,"request_association_score":0.0,"interactive_flow_safety_score":0.0,"official_registry_presence_score":3.0,"safety_transparency_score":2.0,"tool_capability_clarity_score":0.0,"data_exfiltration_resilience_score":0.0,"dependency_supply_chain_signal_score":0.0,"input_sanitization_safety_score":0.0,"tool_namespace_clarity_score":0.0},"capability_taxonomy":[],"machine_summary":{},"taxonomy_tags":[],"score_decomposition":[],"validation_diff":null,"tool_snapshot_diff":null,"connector_replay":{},"request_association":{},"production_readiness":{"code":"failing","label":"Failing","reason":"The latest validation run was attempted but did not complete successfully.","badge":"score-low"},"recommended_for":[],"history_summary":{},"validation_timeline":[],"evidence_confidence":{"score":null,"label":"not_assessed","reason":"No evidence-bearing validation runs exist yet (0 captured checks, validation age 6.4 hours). Confidence cannot be computed.","live_check_count":0,"validation_age_hours":6.43,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":6.43,"freshness_threshold_hours":24}},"incident_feed":[],"disputes":[],"remediations":[],"client_remediation_modes":[],"client_profiles":[],"client_readiness_verdicts":[],"publishability_policy_profiles":[],"compatibility_fixtures":[],"install_snippets":{},"aliases":[],"raw_evidence":{"checks":{"probe_noise_resilience":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"server_card":{"status":"missing","latency_ms":null,"details":{"reason":"no_server_card_url"}},"oauth_protected_resource":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"oauth_authorization_server":{"status":"missing","latency_ms":null,"details":{"reason":"no_authorization_server"}},"openid_configuration":{"status":"missing","latency_ms":null,"details":{"reason":"no_authorization_server"}},"initialize":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"protocol_version_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_protocol_version","validator_protocol_version":"2025-03-26","latest_known_version":"2025-11-25"}},"tools_list":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"prompts_list":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"prompt_get":{"status":"missing","latency_ms":null,"details":{"reason":"not_advertised"}},"resources_list":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"resource_read":{"status":"missing","latency_ms":null,"details":{"reason":"not_advertised"}},"determinism_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"instruction_tool_reference_probe":{"status":"not_assessed","latency_ms":null,"details":{"reason":"initialize_or_tools_unavailable"}},"session_resume_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"step_up_auth_probe":{"status":"missing","latency_ms":null,"details":{"oauth_present":false,"auth_required_checks":[],"supported_scopes":[],"scope_specificity_ratio":0.0,"broad_scopes":[],"challenge_headers":[],"step_up_signals":[],"minimal_scope_documented":false}},"transport_compliance_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_remote_url"}},"utility_coverage_probe":{"status":"missing","latency_ms":null,"details":{"completions":{"advertised":false,"sample_target":null,"live_probe":"not_executed"},"pagination":{"supported":false,"next_cursor_methods":[],"metadata_signal":false},"tasks":{"advertised":false,"probe_status":"missing","http_status":null},"initialize_capability_keys":[]}},"advanced_capabilities_probe":{"status":"missing","latency_ms":null,"details":{"capabilities":{"prompts":false,"resources":false,"completions":false,"roots":false,"sampling":false,"elicitation":false,"structured_outputs":false,"resource_links":false},"enabled_count":0,"enabled":[],"initialize_capability_keys":[]}},"tool_snapshot_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_tools"}},"connector_replay_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_tools"}},"request_association_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_request_association_capabilities_advertised"}},"interactive_flow_probe":{"status":"missing","latency_ms":null,"details":{"risk_hits":[],"safe_hits":[],"oauth_supported":false,"prompt_available":false}},"action_safety_probe":{"status":"not_assessed","latency_ms":null,"details":{"summary":{"tool_count":0,"high_risk_tools":0,"destructive_tools":0,"exec_tools":0,"egress_tools":0,"secret_tools":0,"bulk_access_tools":0,"declared_non_read_only_tools":0,"annotation_conflict_tools":0,"risk_distribution":{"low":0,"medium":0,"high":0,"critical":0},"capability_distribution":{},"has_mutating_capability":false,"has_non_read_capability":false},"auth_present":false,"safeguard_count":0,"confirmation_signals":[],"reason":"empty_observation_set"}},"official_registry_probe":{"status":"missing","latency_ms":null,"details":{"registry_source":"github_topic_registry","direct_match":false,"official_peer_count":0}},"provenance_divergence_probe":{"status":"not_assessed","latency_ms":null,"details":{"direct_official_match":false,"registry_title":null,"server_card_title":null,"registry_version":null,"server_card_version":null,"registry_homepage":null,"server_card_homepage":null,"registry_repository":null,"server_card_repository":null,"drift_fields":[],"metadata_document_count":1,"compared_fields":["title","version","homepage","repository"],"readable_sources":[],"comparable_field_count":0}},"schema_divergence_probe":{"status":"missing","latency_ms":null,"details":{"reason":"no_server_card_tools","compared_tool_count":0,"compared_dimensions":["server_name","server_version","declared_vs_observed_auth","tool_membership","parameter_names","required_parameters","parameter_types","output_schema_presence"],"server_name_mismatch":false,"card_server_name":null,"live_server_name":null,"server_version_mismatch":false,"card_server_version":null,"live_server_version":null,"auth_scheme_mismatch":false}},"connector_publishability_probe":{"status":"error","latency_ms":null,"details":{"transport":null,"tool_count":0,"high_risk_tools":0,"blockers":["remote_transport","initialize","tools_list","protocol_version","session_resume","step_up_auth","transport_compliance","connector_replay","request_association","action_safety","server_card","tool_surface","auth_flow"],"criteria":{"remote_transport":false,"initialize":false,"tools_list":false,"protocol_version":false,"session_resume":false,"step_up_auth":false,"transport_compliance":false,"connector_replay":false,"request_association":false,"action_safety":false,"server_card":false,"tool_surface":false,"auth_flow":false}}}}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA","message":"No endpoint is on record for this entry, so its 6.4h-old last_validated_at stamp is a no-op run, not real validation evidence -- treated as outside the TrustOps SLA regardless of age.","addressee":"publisher"},{"code":"server_failing","severity":"critical","title":"Latest validation is failing","message":"Core MCP flows did not validate successfully on the latest run.","addressee":"publisher"}],"maintainer_analytics":{},"public_server_reputation":{},"maintainer_response_quality":{},"maintainer_annotations":[],"maintainer_rebuttals":[],"security_posture_summary":{},"tool_security_inventory":[],"transport_compliance":{},"utility_coverage":{},"write_action_governance":{},"provenance_divergence":{},"alias_consolidation":{},"alert_routing":{},"authenticated_validation":{},"hosted_runtime":{},"action_controls_diff":null,"benchmark_tasks":[],"latest_capability_counts":{},"point_loss_breakdown":[],"verdict_traces":{},"current_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_8069bc5966a46e18","generated_at":"2026-08-14T19:53:40.006608+00:00","trust_evaluated_at":"2026-08-14T19:53:40.006608+00:00","evidence_revision":"f2707db1c3f1bbfc5398a1d9","source":"current_snapshot","server":"github-horizungroup/horizun-msproject-mcp","last_validated_at":"2026-08-14T13:27:39.412670+00:00","validation_age_hours":6.43,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-08-14T13:27:39.412670+00:00","age_hours":6.43,"bucket":"never_validated","label":"Never validated","badges":["never_validated"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"failing","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Not assessed","why":"tool surface has not been observed by any completed validation run","next_action":"revalidate so the tool surface can be inspected before a production decision is made","reason_count":0},"production_readiness_class":{"code":"failing","label":"Failing","reason":"The latest validation run was attempted but did not complete successfully."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":6.43,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":6.43,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"server_failing","severity":"critical","title":"Latest validation is failing"}],"active_alert_summary":{"critical":1,"high":0,"medium":1,"low":0,"high_or_critical":1,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-08-14T19:53:40.006608+00:00"}},"trust_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_8069bc5966a46e18","generated_at":"2026-08-14T19:53:40.006608+00:00","trust_evaluated_at":"2026-08-14T19:53:40.006608+00:00","evidence_revision":"f2707db1c3f1bbfc5398a1d9","source":"current_snapshot","server":"github-horizungroup/horizun-msproject-mcp","last_validated_at":"2026-08-14T13:27:39.412670+00:00","validation_age_hours":6.43,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-08-14T13:27:39.412670+00:00","age_hours":6.43,"bucket":"never_validated","label":"Never validated","badges":["never_validated"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"failing","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Not assessed","why":"tool surface has not been observed by any completed validation run","next_action":"revalidate so the tool surface can be inspected before a production decision is made","reason_count":0},"production_readiness_class":{"code":"failing","label":"Failing","reason":"The latest validation run was attempted but did not complete successfully."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":6.43,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":6.43,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"server_failing","severity":"critical","title":"Latest validation is failing"}],"active_alert_summary":{"critical":1,"high":0,"medium":1,"low":0,"high_or_critical":1,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-08-14T19:53:40.006608+00:00"}},"agent_commerce":{},"latest_claim":null,"maintainer_profile_slug":null,"watch_summary":{},"partial":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"trust_evaluated_at":"2026-08-14T19:53:40.006608+00:00","evidence_revision":"f2707db1c3f1bbfc5398a1d9","active_alert_summary":{"critical":1,"high":0,"medium":1,"low":0,"high_or_critical":1,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-08-14T19:53:40.006608+00:00"},"owner_opted_out":false},"latest_validation":null,"current_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_8069bc5966a46e18","generated_at":"2026-08-14T19:53:40.006608+00:00","trust_evaluated_at":"2026-08-14T19:53:40.006608+00:00","evidence_revision":"f2707db1c3f1bbfc5398a1d9","source":"current_snapshot","server":"github-horizungroup/horizun-msproject-mcp","last_validated_at":"2026-08-14T13:27:39.412670+00:00","validation_age_hours":6.43,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-08-14T13:27:39.412670+00:00","age_hours":6.43,"bucket":"never_validated","label":"Never validated","badges":["never_validated"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"failing","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Not assessed","why":"tool surface has not been observed by any completed validation run","next_action":"revalidate so the tool surface can be inspected before a production decision is made","reason_count":0},"production_readiness_class":{"code":"failing","label":"Failing","reason":"The latest validation run was attempted but did not complete successfully."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":6.43,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":6.43,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"server_failing","severity":"critical","title":"Latest validation is failing"}],"active_alert_summary":{"critical":1,"high":0,"medium":1,"low":0,"high_or_critical":1,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-08-14T19:53:40.006608+00:00"}},"trust_snapshot":{"schema_version":"verify.trust_snapshot.v1","snapshot_id":"trustsnap_8069bc5966a46e18","generated_at":"2026-08-14T19:53:40.006608+00:00","trust_evaluated_at":"2026-08-14T19:53:40.006608+00:00","evidence_revision":"f2707db1c3f1bbfc5398a1d9","source":"current_snapshot","server":"github-horizungroup/horizun-msproject-mcp","last_validated_at":"2026-08-14T13:27:39.412670+00:00","validation_age_hours":6.43,"freshness":{"schema_version":"verify.freshness_profile.v1","last_validated_at":"2026-08-14T13:27:39.412670+00:00","age_hours":6.43,"bucket":"never_validated","label":"Never validated","badges":["never_validated"],"freshness_sla_hours":720.0,"freshness_sla_status":"met","stale_score_suppressed":false,"display_score":null,"raw_score":null,"confidence_score":null,"confidence_weighted_score":null,"tier_status":[{"tier":"community","label":"Community","freshness_sla_hours":720,"met":true,"priority_revalidation":false},{"tier":"pro","label":"Pro","freshness_sla_hours":168,"met":true,"priority_revalidation":true},{"tier":"enterprise","label":"Enterprise","freshness_sla_hours":24,"met":true,"priority_revalidation":true}]},"current_status":"failing","current_score":null,"display_score":null,"stale_score_suppressed":false,"production_trust_decision":{"schema_version":"verify.executive_verdict.v1","decision":"Not assessed","why":"tool surface has not been observed by any completed validation run","next_action":"revalidate so the tool surface can be inspected before a production decision is made","reason_count":0},"production_readiness_class":{"code":"failing","label":"Failing","reason":"The latest validation run was attempted but did not complete successfully."},"evidence_confidence":{"score":null,"label":"not_assessed","validation_age_hours":6.43,"live_check_count":0,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":6.43,"freshness_threshold_hours":24}},"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA"},{"code":"server_failing","severity":"critical","title":"Latest validation is failing"}],"active_alert_summary":{"critical":1,"high":0,"medium":1,"low":0,"high_or_critical":1,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-08-14T19:53:40.006608+00:00"}},"partial":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"snapshot_invariant":{"schema_version":"verify.snapshot_invariant.v1","server":"github-horizungroup/horizun-msproject-mcp","ok":true,"surface_snapshot_ids":{"page":"trustsnap_8069bc5966a46e18","badge":null,"report":"trustsnap_8069bc5966a46e18","policy":null},"checked_surfaces":["page","report"],"unchecked_surfaces":["badge","policy"],"checked_count_surfaces":[],"count_mismatches":{},"checked_at":"2026-08-14T19:53:39.961246+00:00"},"history":{},"production_readiness":{"code":"failing","label":"Failing","reason":"The latest validation run was attempted but did not complete successfully.","badge":"score-low"},"agent_commerce_readiness":{},"evidence_confidence":{"score":null,"label":"not_assessed","reason":"No evidence-bearing validation runs exist yet (0 captured checks, validation age 6.4 hours). Confidence cannot be computed.","live_check_count":0,"validation_age_hours":6.43,"basis":{"evidence_bearing_validations":0,"affirmative_live_check_count":0,"validation_age_hours":6.43,"freshness_threshold_hours":24}},"recommended_for":[],"active_alerts":[{"code":"validation_stale","severity":"medium","title":"Validation evidence is outside TrustOps SLA","message":"No endpoint is on record for this entry, so its 6.4h-old last_validated_at stamp is a no-op run, not real validation evidence -- treated as outside the TrustOps SLA regardless of age.","addressee":"publisher"},{"code":"server_failing","severity":"critical","title":"Latest validation is failing","message":"Core MCP flows did not validate successfully on the latest run.","addressee":"publisher"}],"remediations":[],"cache_note":"Fast fallback response; full report evidence is deferred to protect web capacity. Fields listed in fields_unavailable (including tool_security_inventory, and write_action_governance) are not yet computed on this response -- an empty value means unchecked, not confirmed clean. Treat partial responses as indeterminate.","publisher_claim":{"verified":false,"status":"unclaimed","claim_url":"https://verify.sentinelsignal.io/claim?server=github-horizungroup%2Fhorizun-msproject-mcp&source=report_json","reason_code":"claim_to_publish_metadata","reason":"Claim this profile to verify publisher identity, add evidence, and manage trust metadata.","score_neutral":true},"observed_attention":{"schema":"verify.observed_attention.v1","window_days":30,"level":"none","label":"No observed attention","summary":"No recent machine-readable trust or discovery activity observed for this server.","segments":{"useful_ai_user":{"level":"none","observed":false,"description":"AI-assisted user sessions such as ChatGPT/User or Claude/User."},"machine_trust_evaluator":{"level":"none","observed":false,"description":"Synthetic sessions inspecting multiple trust surfaces such as report, policy, ledger, badge, trust-summary, or compare."},"possible_agent_or_script":{"level":"none","observed":false,"description":"Structured direct sessions with rapid profile, compare, report, policy, badge, or trust-surface fan-out."},"isolated_machine_surface":{"level":"none","observed":false,"description":"Aged-out direct synthetic singleton sessions that touched a machine-readable trust surface without becoming a broader evaluator."},"ai_crawler":{"level":"none","observed":false,"description":"Known AI crawler activity such as ClaudeBot, GPTBot, or similar crawlers."},"search_crawler":{"level":"none","observed":false,"description":"Search and SEO crawler activity."},"browser_like_automation":{"level":"none","observed":false,"description":"Browser-like synthetic sessions with rapid structured endpoint activity."},"confirmed_human":{"level":"none","observed":false,"description":"Confirmed browser-session human activity."}},"surfaces_observed":{"server_profile":false,"compare":false,"compare_json":false,"compare_api":false,"report_json":false,"policy":false,"ledger":false,"badge_metadata":false,"badge_svg":false,"trust_summary":false,"mcp_tool":false},"claim_prompt":{"recommended":false,"reason":"No claim prompt is recommended from observed attention in the current window."},"notes":["Observed attention is based on segmented first-party telemetry.","Crawler and evaluator activity is not treated as confirmed human demand.","Public levels are bucketed to avoid exposing raw traffic counts."]},"owner_activation":{"claim_recommended":false,"reason":"no_observed_attention"},"related_machine_surfaces":{"compare_index":"/compare.json","compare_api":"/v1/compare?server=github-horizungroup%2Fhorizun-msproject-mcp","trust_summary":"/v1/servers/github-horizungroup/horizun-msproject-mcp/trust-summary","ledger":"/v1/servers/github-horizungroup/horizun-msproject-mcp/ledger","policy":"/v1/servers/github-horizungroup/horizun-msproject-mcp/policy","report":"/v1/servers/github-horizungroup/horizun-msproject-mcp/report"},"intelligence_api":{"available":true,"signup_url":"https://verify.sentinelsignal.io/verify-intelligence-api","use_case":"Programmatic MCP server trust, comparison, policy, and evidence enrichment."},"trust_evaluated_at":"2026-08-14T19:53:40.006608+00:00","evidence_revision":"f2707db1c3f1bbfc5398a1d9","active_alert_summary":{"critical":1,"high":0,"medium":1,"low":0,"high_or_critical":1,"total":2},"materialization":{"state":"partial","trust_core_complete":true,"fields_unavailable":["tool_security_inventory","security_posture_summary","write_action_governance","capability_taxonomy","remediations"],"materialized_at":"2026-08-14T19:53:40.006608+00:00"}}