Horizun Project MCP
An MCP server for Microsoft Project that reads, analyzes, and writes .mpp, .xer, and .xml schedule files, offering critical path analysis, DCMA 14-point assessment, and verified writes without requiring Java or Microsoft Project.
Not Assessed
trustsnap_2df9eabd6c00e0a5.- OAuth or protected-resource evidence is not present
- Correct the registry entry so it points at the actual MCP endpoint, not the directory listing
- No segmented attention signals observed in the current window.
Dispute this assessment
If any published claim about this server -- its score, a risk flag, a capability classification, or its taxonomy -- is factually wrong, tell us what evidence shows and we will review it. This does not require claiming or verifying ownership of the server first.
Verify responds to disputes within 5 business days and resolves them within 15.
Dispute history
No disputes filed for this server.
Risks
Security posture
No security posture summary available yet.
Tool capability & risk inventory
No tool inventory available from the latest validation run.
Write-action governance
No write-action governance summary is available yet.
Recommended runtime policy
No tool surface has been observed yet -- this is not the same as a clean bill of health. Revalidate before treating this server as policy-cleared.
Action-controls diff
Need at least two validation runs before diffing action controls.
Critical alerts
Compatibility
Client readiness verdicts
No client readiness verdicts are available yet.
Client readiness gate details
No per-client remediation checklist is available yet.
Verdict traces
No verdict trace data is available yet.
Publishability policy profiles
No publishability policy profiles are available yet.
Compatibility fixtures
No compatibility fixtures are available yet.
Recommended for
No recommendation profile is available yet.
Evidence
Current trust snapshot
trustsnap_2df9eabd6c00e0a5Canonical machine links
Evidence confidence
Latest validation evidence
No validation run available yet.
Known versions
- No versions recorded.
Public server reputation
No public server reputation signals are available yet.
Benchmark tasks
No benchmark tasks are available yet.
Utility coverage
No utility-coverage summary is available yet.
Tool snapshot diff & changelog
Need at least two validation runs before building a tool changelog.
Validation diff
Need at least two validation runs before diffing changes.
Registry & provenance divergence
No provenance-divergence summary is available yet.
Active alerts
No active alerts for the current server state.
Aliases & registry graph
No aliases discovered for this server.
Alias consolidation
No alias consolidation details are available yet.
Fix it
Why this score?
No score decomposition available yet.
Algorithmic score breakdown
9 component(s) not assessed for this run: Abuse/Noise Resilience, Transport Compliance, Action Safety, Provenance Divergence, Destructive Operation Safety, Egress / SSRF Resilience, Execution / Sandbox Safety, Least Privilege Scope, Secret Handling Hygiene
Experimental candidate components
Actionable remediation
No remediation items. Current evidence does not show urgent client-facing fixes.
Point loss breakdown
No current score penalties are recorded.
Technical compatibility profiles
No compatibility profiles available.
Governance
MCP TrustOps
TrustOps turns this report into operational controls: validation targets and SLAs, authenticated validation, semantic benchmarks, policy exports, alert subscriptions, badges, cost/compliance metadata, and runtime routing. Fresh trusted index decisions stay separate from long-tail inventory so stale scores do not masquerade as current evidence.
/v1/decideAlert subscription types
MCP Runtime hosting
No hosted runtime profile is available yet.
Authenticated validation sessions
No authenticated validation detail is available yet.
Public validation is free. Authenticated validation is paid and proves scoped behavior, write-action safeguards, and authenticated tool execution.
Install snippets
No install snippets available.
Agent access & tool surface
tools/list, prompts/list, and resources/list checks.HorizunGroup/horizun-msproject-mcp.History
Validation history
Trend history appears after at least two validation runs. This avoids presenting a one-point validation as a trend.
Validation timeline
No validation timeline is available yet.
Recent validation runs
| Started | Status | Summary | Latency | Checks |
|---|---|---|---|---|
| No validation runs yet. | ||||
Incident & change feed
No incidents or changes recorded yet.
Technical details
Raw evidence view
Show raw JSON evidence
{
"checks": {
"action_safety_probe": {
"details": {
"reason": "empty_observation_set"
},
"status": "not_assessed"
}
}
}
Capabilities
- OAuth:
- DCR/CIMD:
- Prompts:
- Homepage: https://glama.ai/mcp/servers/z7a7vvhs40
- Docs: none
- Support: https://github.com/HorizunGroup/horizun-msproject-mcp
- Icon: none
- Remote endpoint: none
- Directory listing: https://glama.ai/mcp/servers/z7a7vvhs40
- Server card: none
Transport compliance drilldown
No transport compliance drilldown is available yet.
Request association
No request-association evidence is available yet.
Connector replay
No connector replay evidence is available yet.