HorizunGroup/horizun-msproject-mcp
MCP server for Microsoft Project: no Java, no Project install. Critical-path engine, DCMA 14-point assessment, verified writes, and a BIM 4D bridge.
Block For Production
trustsnap_7f62ded35be2e4fa.- Utility Coverage
- Transport Fidelity
- Transport Compliance
- Make tools/list succeed unauthenticated when possible, or document the auth flow in the server card.
- Allow initialize to succeed consistently, or return a deterministic auth-required response with clear metadata.
- Fix the failing checks first, then revalidate to confirm the recovery path.
- No segmented attention signals observed in the current window.
Dispute this assessment
If any published claim about this server -- its score, a risk flag, a capability classification, or its taxonomy -- is factually wrong, tell us what evidence shows and we will review it. This does not require claiming or verifying ownership of the server first.
Verify responds to disputes within 5 business days and resolves them within 15.
Dispute history
No disputes filed for this server.
Risk
Security posture
Tool capability & risk inventory
No tool inventory available from the latest validation run.
Write-action governance
Status detail: No write-action governance evidence is available yet.
| Tool | Risk | Flags | Safeguards |
|---|---|---|---|
| High-risk tool assessment unavailable -- no tools were analyzed. | |||
Action-controls diff
Need at least two validation runs before diffing action controls.
Critical alerts
Compatibility
Client compatibility verdicts
Client compatibility only means the server shape can work with a client. Production trust decision and write-action publishing are evaluated separately so a client-compatible server can still be blocked for production.
Evidence provenance
initialize• Missingtools_list• Missingtransport_compliance_probe• Missingstep_up_auth_probe• Missingconnector_replay_probe• Missing — Frozen tool snapshots must survive refresh.request_association_probe• Missing — Roots, sampling, and elicitation should stay request-scoped.
Evidence provenance
initialize• Missingtools_list• Missingtransport_compliance_probe• Missing
Evidence provenance
action_safety_probe• Not_Assessed
Evidence provenance
tool_snapshot_probe• Missingconnector_replay_probe• Missing
Client compatibility gate details
Remediation checklist
- Expose the server over streamable HTTP transport.
- Publish a public remote MCP endpoint URL.
- Add OAuth-based authentication for remote connector auth.
- Support dynamic client registration (DCR) to simplify connector setup.
- Fix the server so its initialize handshake succeeds.
- Fix the server so tools/list returns successfully.
Remediation checklist
- Publish a reachable remote MCP URL.
- Fix the server so initialize succeeds or cleanly requests auth.
- Fix the server so tools/list returns successfully.
- Resolve the transport compliance failure -- see the transport compliance probe evidence for what specifically broke.
- Expose at least one tool.
- Switch to a streamable-HTTP or SSE transport.
Remediation checklist
- Resolve the active alert: Latest validation is failing.
Verdict traces
server_failing• critical • Latest validation is failing
Client verdict trace table
| Verdict | Status | Checks | Winning source | Conflicts |
|---|---|---|---|---|
openai_connectors |
Not client-compatible | initialize, tools_list, transport_compliance_probe, step_up_auth_probe, connector_replay_probe, request_association_probe | live_validation | none |
claude_desktop |
Not client-compatible | initialize, tools_list, transport_compliance_probe | live_validation | none |
unsafe_for_write_actions |
Publishing blocked | action_safety_probe | live_validation | none |
snapshot_churn_risk |
Not Assessed | tool_snapshot_probe, connector_replay_probe | history | none |
Publishability policy profiles
- Search Fetch Only: No
- Write Actions Present: No
- Oauth Configured: No
- Admin Refresh Required: No
- Safe For Company Knowledge: No
- Safe For Messages Api Remote Mcp: No
- Search Fetch Only: No
- Write Actions Present: No
- Oauth Configured: No
- Admin Refresh Required: No
- Safe For Company Knowledge: No
- Safe For Messages Api Remote Mcp: No
Compatibility fixtures
- remote_http_endpoint: Likely to fail
- oauth_discovery: Degraded
- frozen_tool_snapshot_refresh: Passes
- request_association: Passes
- remote_transport: Likely to fail
- tool_discovery: Likely to fail
- auth_connect: Likely to fail
- safe_write_review: Degraded
Recommended for
No recommendation profile is available yet.
Evidence
Current trust snapshot
trustsnap_7f62ded35be2e4faCanonical machine links
Evidence confidence
Latest validation evidence
Failures
initializeno remote urloauth_authorization_serverno authorization serveroauth_protected_resourceno remote urlopenid_configurationno authorization serverprobe_noise_resilienceno remote urlserver_cardno server card urltools_listno remote url
Checks
| Check | Status | Latency | Evidence |
|---|---|---|---|
action_safety_probe |
Not_Assessed | n/a | No write-action risk evidence recorded. |
advanced_capabilities_probe |
Missing | n/a | No advanced MCP capability signals detected. |
connector_publishability_probe |
Error | n/a | Publishability blockers: remote transport, initialize, tools list, protocol version, +5 more. |
connector_replay_probe |
Missing | n/a | No connector replay evidence recorded. |
determinism_probe |
Missing | n/a | no remote url |
initialize |
Missing | n/a | no remote url |
interactive_flow_probe |
Missing | n/a | Check completed |
oauth_authorization_server |
Missing | n/a | no authorization server |
oauth_protected_resource |
Missing | n/a | no remote url |
official_registry_probe |
Missing | n/a | Check completed |
openid_configuration |
Missing | n/a | no authorization server |
probe_noise_resilience |
Missing | n/a | no remote url |
prompt_get |
Missing | n/a | not advertised |
prompts_list |
Missing | n/a | no remote url |
protocol_version_probe |
Missing | n/a | No protocol version was advertised. |
provenance_divergence_probe |
Not_Assessed | n/a | Check completed |
request_association_probe |
Missing | n/a | No request-association capabilities were advertised. |
resource_read |
Missing | n/a | not advertised |
resources_list |
Missing | n/a | no remote url |
schema_divergence_probe |
Missing | n/a | no server card tools |
server_card |
Missing | n/a | no server card url |
session_resume_probe |
Missing | n/a | no remote url |
step_up_auth_probe |
Missing | n/a | No OAuth or incremental-scope signals detected. |
tool_snapshot_probe |
Missing | n/a | no tools |
tools_list |
Missing | n/a | no remote url |
transport_compliance_probe |
Missing | n/a | Session header=no, protocol header=no, bad protocol=n/a. |
utility_coverage_probe |
Missing | n/a | No completions evidence; no pagination evidence; tasks missing. |
Raw evidence view
Show raw JSON evidence
{
"checks": {
"action_safety_probe": {
"details": {
"auth_present": false,
"confirmation_signals": [],
"reason": "empty_observation_set",
"safeguard_count": 0,
"summary": {
"annotation_conflict_tools": 0,
"bulk_access_tools": 0,
"capability_distribution": {},
"declared_non_read_only_tools": 0,
"destructive_tools": 0,
"egress_tools": 0,
"exec_tools": 0,
"has_mutating_capability": false,
"has_non_read_capability": false,
"high_risk_tools": 0,
"risk_distribution": {
"critical": 0,
"high": 0,
"low": 0,
"medium": 0
},
"secret_tools": 0,
"tool_count": 0
}
},
"latency_ms": null,
"status": "not_assessed"
},
"advanced_capabilities_probe": {
"details": {
"capabilities": {
"completions": false,
"elicitation": false,
"prompts": false,
"resource_links": false,
"resources": false,
"roots": false,
"sampling": false,
"structured_outputs": false
},
"enabled": [],
"enabled_count": 0,
"initialize_capability_keys": []
},
"latency_ms": null,
"status": "missing"
},
"connector_publishability_probe": {
"details": {
"blockers": [
"remote_transport",
"initialize",
"tools_list",
"protocol_version",
"transport_compliance",
"action_safety",
"server_card",
"tool_surface",
"auth_flow"
],
"criteria": {
"action_safety": false,
"auth_flow": false,
"connector_replay": true,
"initialize": false,
"protocol_version": false,
"remote_transport": false,
"request_association": true,
"server_card": false,
"session_resume": true,
"step_up_auth": true,
"tool_surface": false,
"tools_list": false,
"transport_compliance": false
},
"high_risk_tools": 0,
"tool_count": 0,
"transport": null
},
"latency_ms": null,
"status": "error"
},
"connector_replay_probe": {
"details": {
"reason": "no_tools"
},
"latency_ms": null,
"status": "missing"
},
"determinism_probe": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"initialize": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"interactive_flow_probe": {
"details": {
"oauth_supported": false,
"prompt_available": false,
"risk_hits": [],
"safe_hits": []
},
"latency_ms": null,
"status": "missing"
},
"oauth_authorization_server": {
"details": {
"reason": "no_authorization_server"
},
"latency_ms": null,
"status": "missing"
},
"oauth_protected_resource": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"official_registry_probe": {
"details": {
"direct_match": false,
"official_peer_count": 0,
"registry_source": "github_topic_registry"
},
"latency_ms": null,
"status": "missing"
},
"openid_configuration": {
"details": {
"reason": "no_authorization_server"
},
"latency_ms": null,
"status": "missing"
},
"probe_noise_resilience": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"prompt_get": {
"details": {
"reason": "not_advertised"
},
"latency_ms": null,
"status": "missing"
},
"prompts_list": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"protocol_version_probe": {
"details": {
"latest_known_version": "2025-11-25",
"reason": "no_protocol_version",
"validator_protocol_version": "2025-03-26"
},
"latency_ms": null,
"status": "missing"
},
"provenance_divergence_probe": {
"details": {
"comparable_field_count": 0,
"compared_fields": [
"title",
"version",
"homepage",
"repository"
],
"direct_official_match": false,
"drift_fields": [],
"metadata_document_count": 1,
"readable_sources": [],
"registry_homepage": null,
"registry_repository": null,
"registry_title": null,
"registry_version": null,
"server_card_homepage": null,
"server_card_repository": null,
"server_card_title": null,
"server_card_version": null
},
"latency_ms": null,
"status": "not_assessed"
},
"request_association_probe": {
"details": {
"reason": "no_request_association_capabilities_advertised"
},
"latency_ms": null,
"status": "missing"
},
"resource_read": {
"details": {
"reason": "not_advertised"
},
"latency_ms": null,
"status": "missing"
},
"resources_list": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"schema_divergence_probe": {
"details": {
"auth_scheme_mismatch": false,
"card_server_name": null,
"card_server_version": null,
"compared_dimensions": [
"server_name",
"server_version",
"declared_vs_observed_auth",
"tool_membership",
"parameter_names",
"required_parameters",
"parameter_types",
"output_schema_presence"
],
"compared_tool_count": 0,
"live_server_name": null,
"live_server_version": null,
"reason": "no_server_card_tools",
"server_name_mismatch": false,
"server_version_mismatch": false
},
"latency_ms": null,
"status": "missing"
},
"server_card": {
"details": {
"reason": "no_server_card_url"
},
"latency_ms": null,
"status": "missing"
},
"session_resume_probe": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"step_up_auth_probe": {
"details": {
"auth_required_checks": [],
"broad_scopes": [],
"challenge_headers": [],
"minimal_scope_documented": false,
"oauth_present": false,
"scope_specificity_ratio": 0.0,
"step_up_signals": [],
"supported_scopes": []
},
"latency_ms": null,
"status": "missing"
},
"tool_snapshot_probe": {
"details": {
"reason": "no_tools"
},
"latency_ms": null,
"status": "missing"
},
"tools_list": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"transport_compliance_probe": {
"details": {
"reason": "no_remote_url"
},
"latency_ms": null,
"status": "missing"
},
"utility_coverage_probe": {
"details": {
"completions": {
"advertised": false,
"live_probe": "not_executed",
"sample_target": null
},
"initialize_capability_keys": [],
"pagination": {
"metadata_signal": false,
"next_cursor_methods": [],
"supported": false
},
"tasks": {
"advertised": false,
"http_status": null,
"probe_status": "missing"
}
},
"latency_ms": null,
"status": "missing"
}
},
"failures": {
"initialize": {
"reason": "no_remote_url"
},
"oauth_authorization_server": {
"reason": "no_authorization_server"
},
"oauth_protected_resource": {
"reason": "no_remote_url"
},
"openid_configuration": {
"reason": "no_authorization_server"
},
"probe_noise_resilience": {
"reason": "no_remote_url"
},
"server_card": {
"reason": "no_server_card_url"
},
"tools_list": {
"reason": "no_remote_url"
}
},
"remote_url": null,
"server_card_payload": null,
"server_identifier": "github-horizungroup/horizun-msproject-mcp"
}
Known versions
- No versions recorded.
Validation history
| Timestamp | Status | Score | Latency | Tools |
|---|---|---|---|---|
| Aug 10, 2026 05:05:10 PM UTC | Failing | 0.0 | 8.9 ms | 0 |
| Aug 10, 2026 05:04:27 AM UTC | Failing | 0.0 | 5.8 ms | 0 |
| Aug 09, 2026 04:47:57 PM UTC | Failing | 0.0 | 6.4 ms | not fetched |
| Aug 09, 2026 04:47:17 AM UTC | Failing | 0.0 | 6.8 ms | not fetched |
| Aug 08, 2026 04:24:33 PM UTC | Failing | 0.0 | 6.0 ms | not fetched |
| Aug 08, 2026 03:40:58 AM UTC | Failing | 0.0 | 6.2 ms | not fetched |
| Aug 07, 2026 03:40:04 PM UTC | Failing | 0.0 | 9.8 ms | not fetched |
| Aug 07, 2026 03:36:14 AM UTC | Failing | 0.0 | 8.5 ms | not fetched |
Validation timeline
| Validated | Summary | Score | Protocol | Auth mode | Tools | High-risk tools | Changes |
|---|---|---|---|---|---|---|---|
| Aug 10, 2026 05:05:10 PM UTC | Failing | 0.0 | unknown | unknown | 0 | 0 | none |
| Aug 10, 2026 05:04:27 AM UTC | Failing | 0.0 | unknown | unknown | 0 | 0 | none |
| Aug 09, 2026 04:47:57 PM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
| Aug 09, 2026 04:47:17 AM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
| Aug 08, 2026 04:24:33 PM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
| Aug 08, 2026 03:40:58 AM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
| Aug 07, 2026 03:40:04 PM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
| Aug 07, 2026 03:36:14 AM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
| Aug 06, 2026 03:35:46 PM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
| Aug 06, 2026 03:13:30 AM UTC | Failing | 0.0 | unknown | unknown | not fetched | 0 | none |
Recent validation runs
| Started | Status | Summary | Latency | Checks |
|---|---|---|---|---|
| Aug 10, 2026 05:05:10 PM UTC | Completed | Failing | 8.9 ms | action_safety_probe, advanced_capabilities_probe, connector_publishability_probe, connector_replay_probe, determinism_probe, initialize, interactive_flow_probe, oauth_authorization_server, oauth_protected_resource, official_registry_probe, openid_configuration, probe_noise_resilience, prompt_get, prompts_list, protocol_version_probe, provenance_divergence_probe, request_association_probe, resource_read, resources_list, schema_divergence_probe, server_card, session_resume_probe, step_up_auth_probe, tool_snapshot_probe, tools_list, transport_compliance_probe, utility_coverage_probe |
| Aug 10, 2026 05:04:27 AM UTC | Completed | Failing | 5.8 ms | action_safety_probe, advanced_capabilities_probe, connector_publishability_probe, connector_replay_probe, determinism_probe, initialize, interactive_flow_probe, oauth_authorization_server, oauth_protected_resource, official_registry_probe, openid_configuration, probe_noise_resilience, prompt_get, prompts_list, protocol_version_probe, provenance_divergence_probe, request_association_probe, resource_read, resources_list, schema_divergence_probe, server_card, session_resume_probe, step_up_auth_probe, tool_snapshot_probe, tools_list, transport_compliance_probe, utility_coverage_probe |
| Aug 09, 2026 04:47:57 PM UTC | Completed | Failing | 6.4 ms | |
| Aug 09, 2026 04:47:17 AM UTC | Completed | Failing | 6.8 ms | |
| Aug 08, 2026 04:24:33 PM UTC | Completed | Failing | 6.0 ms | |
| Aug 08, 2026 03:40:58 AM UTC | Completed | Failing | 6.2 ms | |
| Aug 07, 2026 03:40:04 PM UTC | Completed | Failing | 9.8 ms | |
| Aug 07, 2026 03:36:14 AM UTC | Completed | Failing | 8.5 ms | |
| Aug 06, 2026 03:35:46 PM UTC | Completed | Failing | 9.4 ms | |
| Aug 06, 2026 03:13:30 AM UTC | Completed | Failing | 10.2 ms | |
Public server reputation
Incident & change feed
| Timestamp | Event | Details |
|---|---|---|
| Aug 10, 2026 05:05:10 PM UTC | Latest validation: failing | Score 0.0 with status failing. |
| Aug 05, 2026 11:00:13 AM UTC | Score corrected (post-1.0.503 remediation, R1 zero-anchoring) | Prior: 10.59. Corrected: 5.84. |
Capabilities
- OAuth:
- DCR/CIMD:
- Prompts:
- Homepage: https://github.com/HorizunGroup/horizun-msproject-mcp
- Docs: https://github.com/HorizunGroup/horizun-msproject-mcp
- Support: https://github.com/HorizunGroup/horizun-msproject-mcp
- Icon: https://avatars.githubusercontent.com/u/312141329?v=4
- Remote endpoint: none
- Server card: none
Benchmark tasks
| Benchmark task | Status | Evidence |
|---|---|---|
| Discover tools | Likely to fail |
|
| Read-only fetch flow | Likely to fail |
|
| OAuth-required connect | Degraded |
|
| Safe write flow with confirmation | Likely to fail |
|
Utility coverage
Transport compliance drilldown
Issues: none
Request association
Connector replay
Required-argument replay breaks
| Tool | Added required args | Removed required args |
|---|---|---|
| No required-argument replay breaks detected. | ||
Output-schema replay breaks
| Tool | Removed properties | Added properties |
|---|---|---|
| No output-schema replay breaks detected. | ||
Tool snapshot diff & changelog
Need at least two validation runs before building a tool changelog.
Validation diff
Need at least two validation runs before diffing changes.
Registry & provenance divergence
| Field | Registry | Live server card |
|---|---|---|
| Title | n/a | n/a |
| Version | n/a | n/a |
| Homepage | n/a | n/a |
Active alerts
- Latest validation is failing (critical)
Core MCP flows did not validate successfully on the latest run.
Aliases & registry graph
| Identifier | Source | Canonical | Identity evidence | Score |
|---|---|---|---|---|
github-horizungroup/horizun-msproject-mcp |
github_topic_registry | yes | canonical | n/a |
HorizunGroup/horizun-msproject-mcp |
glama_registry | no | repo_slug | n/a |
Alias consolidation
Strong alias identity requires matching remote URL, server-card URL, repository slug, or explicit registry cross-reference; shared provider namespace alone is not identity.
Source disagreements
| Field | What differs | Observed values |
|---|---|---|
| Registry source | Multiple registries or registry sync paths claim this same canonical server. | github_topic_registry glama_registry |
| Homepage | Registry entries disagree on the primary homepage for this server. | https://github.com/HorizunGroup/horizun-msproject-mcp https://glama.ai/mcp/servers/z7a7vvhs40 |
| Registry identifier | Different registry-specific identifiers resolve to the same canonical server record here. | github_topic_registry:HorizunGroup/horizun-msproject-mcp glama_registry:z7a7vvhs40 |
Fix it
Why this score?
Algorithmic score breakdown
2 component(s) not assessed for this run: Action Safety, Provenance Divergence
Experimental candidate components
Actionable remediation
| Severity | Remediation | Why it matters | Recommended action |
|---|---|---|---|
| Critical | Ensure tools/list succeeds consistently | Tools discovery is the minimum viable contract for most MCP clients and directories. | Make tools/list succeed unauthenticated when possible, or document the auth flow in the server card.Playbook
|
| Critical | Make initialize deterministic and client-friendly | If initialize fails or requires undocumented auth, many MCP clients cannot connect. | Allow initialize to succeed consistently, or return a deterministic auth-required response with clear metadata.Playbook
|
| Critical | Respond to latest validation is failing | Core MCP flows did not validate successfully on the latest run. | Fix the failing checks first, then revalidate to confirm the recovery path.Playbook
|
| High | Align session and protocol behavior with Streamable HTTP expectations | Clients increasingly rely on MCP-Protocol-Version, session teardown, and expired-session semantics. | Align MCP-Protocol-Version, MCP-Session-Id, DELETE teardown, and expired-session handling with the transport spec.Playbook
|
| High | Expose /.well-known/oauth-protected-resource | Without a protected-resource document, OAuth clients cannot discover auth requirements reliably. | Serve /.well-known/oauth-protected-resource and point it at your authorization server metadata.Playbook
|
| High | Publish OAuth authorization-server metadata | Clients need authorization-server metadata to discover issuer, endpoints, and DCR support. | Publish /.well-known/oauth-authorization-server from your issuer and include registration_endpoint when supported.Playbook
|
| High | Publish a complete server card | Missing or incomplete server-card metadata weakens discovery, documentation, and trust signals. | Serve /.well-known/mcp/server-card.json and include tools, prompts/resources, homepage, and support links.Playbook
|
| Medium | Adopt a current MCP protocol revision | Older protocol revisions reduce compatibility with newer clients and registry programs. | Advertise a current MCP protocol revision (2025-06-18 or later) in both the initialize response and the MCP-Protocol-Version header.Playbook
|
| Medium | Close connector-publishing gaps | Connector catalogs care about protocol recency, session behavior, auth clarity, and tool-surface stability. | |
| Medium | Document minimal scopes and return cleaner auth challenges | Modern clients expect granular scopes and step-up auth signals such as WWW-Authenticate scope hints. | Return granular scopes and WWW-Authenticate challenge hints instead of forcing overly broad auth upfront.Playbook
|
| Medium | Publish OpenID configuration | OIDC metadata improves token validation and client compatibility. | Expose /.well-known/openid-configuration with issuer, jwks_uri, and supported grants.Playbook
|
| Medium | Raise Access & Protocol score | Connectivity, auth, and transport expectations for common clients. | Tighten auth discovery, session behavior, and transport metadata until remote clients can connect without guesswork. |
| Medium | Raise Adoption & Market score | Adoption clues and public evidence that the server is intended for external use. | Increase external documentation and directory coverage so users can discover and evaluate the server. |
| Medium | Raise Interface Quality score | How well the tool/resource interface communicates and behaves under automation. | Improve schemas, error contracts, and recovery messages so agents can reason about the surface automatically. |
| Medium | Raise Reliability & Trust score | Operational stability, consistency, and trustworthiness over time. | Stabilize behavior over time and reduce failure drift between validation runs. |
| Medium | Raise Security Posture score | How safely the exposed tool surface handles destructive actions, egress, execution, secrets, and risky inputs. | Reduce destructive, egress, exec, secret, and freeform-input risk across the exposed tool surface.Playbook
|
| Low | Expose modern utility surfaces like completions, pagination, or tasks | Utility coverage improves interoperability with larger clients and long-lived agent workflows. | Expose completions, pagination, and task metadata where supported so larger clients can plan and resume work safely.Playbook
|
| Low | Publish newer MCP capability signals | Roots, sampling, elicitation, structured outputs, and related metadata improve client understanding and ranking. | Advertise only the advanced capabilities (roots, sampling, elicitation) you have actually implemented end to end in the initialize capabilities object.Playbook
|
| Low | Publish or reconcile the server in the official MCP registry | Official registry presence improves discovery confidence and cross-source consistency. |
Point loss breakdown
| Component | Current | Points missing |
|---|---|---|
| Utility Coverage | 0/4 | -4.0 |
| Transport Fidelity | 0/4 | -4.0 |
| Transport Compliance | 0/4 | -4.0 |
| Tool Surface Design | 0/4 | -4.0 |
| Tool Snapshot Churn | 0/4 | -4.0 |
| Tool Namespace Clarity | 0/4 | -4.0 |
| Tool Capability Clarity | 0/4 | -4.0 |
| Task Success | 0/4 | -4.0 |
| Step Up Auth | 0/4 | -4.0 |
| Spec Recency | 0/4 | -4.0 |
| SLO Health | 0/4 | -4.0 |
| Session Semantics | 0/4 | -4.0 |
Compatibility profiles
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
Governance
MCP TrustOps
TrustOps turns this report into operational controls: freshness SLAs, authenticated validation, semantic benchmarks, policy exports, alert subscriptions, badges, cost/compliance metadata, and runtime routing. Fresh trusted index decisions stay separate from long-tail inventory so stale scores do not masquerade as current evidence.
/v1/decideAlert subscription types
MCP Runtime hosting
Verify Hosted MCP turns a trusted server report into a managed remote MCP endpoint with GitHub deployment provenance, sandbox policy, encrypted secrets, release history, rollback, and audit/usage events.
/hosted/{namespace}/{name}/mcp| Deployment | Status | Endpoint | Release |
|---|---|---|---|
| No hosted runtime deployments yet. | |||
Authenticated validation sessions
Public validation is free. Authenticated validation is paid and proves scoped behavior, write-action safeguards, and authenticated tool execution.
/v1/verify/v1/ci/previewInstall snippets
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
No successful connection to this endpoint has been observed yet -- install instructions are withheld until initialize succeeds at least once.
Agent access & tool surface
tools/list, prompts/list, and resources/list checks.github-horizungroup/horizun-msproject-mcp.